2010
DOI: 10.1201/b10430-157
|View full text |Cite
|
Sign up to set email alerts
|

Development of a bridge network life cycle cost model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2013
2013
2013
2013

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Oh and Kim (2004) has taken into account the traffic and environmental characteristics when modelling bridge deterioration and performed the prediction using transition probability and life cycle cost and concluded that Markov chain method provides reasonable prediction. Life cycle cost studies formed an essential part of the BMS-related research since the beginning (Reale et al 2010). A review of methodologies in this field is given by Frangopol (1999).…”
Section: Introductionmentioning
confidence: 99%
“…Oh and Kim (2004) has taken into account the traffic and environmental characteristics when modelling bridge deterioration and performed the prediction using transition probability and life cycle cost and concluded that Markov chain method provides reasonable prediction. Life cycle cost studies formed an essential part of the BMS-related research since the beginning (Reale et al 2010). A review of methodologies in this field is given by Frangopol (1999).…”
Section: Introductionmentioning
confidence: 99%