International Conference on Optical Technology, Semiconductor Materials, and Devices (OTSMD 2022) 2023
DOI: 10.1117/12.2668412
|View full text |Cite
|
Sign up to set email alerts
|

Development and application of on-line calibration device for water injection flowmeter

Abstract: In the process of oilfield waterflood development, the rate of water injection is an important embodiment of water injection management level, which is an important parameter that not only reflects the formation capacity, but also reflects the production capacity of water injection equipment. Because of the influence of injection water quality, production environment, management level and other factors, the water injection flowmeter needs to be calibrated regularly to ensure the accuracy of measurement in the … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…(1) The contradiction between the increasing workload of water injection well testing and adjustment and the limited testing team is increasingly prominent. (2) The point test data of conventional separate injection process is difficult to meet the (3) The conventional separate injection process cannot support the digital transformation and intelligent development of the oilfield [9][10][11][12][13][14][15][16] . In order to solve the above problems, Daqing Oilfield has studied the cable-controlled layered water injection technology and carried out demonstration application.…”
Section: Introductionmentioning
confidence: 99%
“…(1) The contradiction between the increasing workload of water injection well testing and adjustment and the limited testing team is increasingly prominent. (2) The point test data of conventional separate injection process is difficult to meet the (3) The conventional separate injection process cannot support the digital transformation and intelligent development of the oilfield [9][10][11][12][13][14][15][16] . In order to solve the above problems, Daqing Oilfield has studied the cable-controlled layered water injection technology and carried out demonstration application.…”
Section: Introductionmentioning
confidence: 99%