2018
DOI: 10.1016/j.promfg.2018.06.020
|View full text |Cite
|
Sign up to set email alerts
|

Developing the Requirements of a PLM/ALM Integration: An Industrial Case Study

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(10 citation statements)
references
References 5 publications
0
9
0
1
Order By: Relevance
“…In addition to the technical challenges that ALM-PLM integration brings with it, organisational challenges must also be solved. Essential for the development or introduction of an ALM-PLM integration is, on the one hand, a good understanding of the ALM and PLM approaches themselves and, on the other hand, an understanding of the effects and possibilities of an integration of the two approaches (Deuter et al, 2018). Furthermore, the initial introduction of an ALM-PLM integration requires extensive, complex and professional change management, as this change requires farreaching and comprehensive interventions in product development.…”
Section: Challenges Of Integrating Alm and Plmmentioning
confidence: 99%
See 2 more Smart Citations
“…In addition to the technical challenges that ALM-PLM integration brings with it, organisational challenges must also be solved. Essential for the development or introduction of an ALM-PLM integration is, on the one hand, a good understanding of the ALM and PLM approaches themselves and, on the other hand, an understanding of the effects and possibilities of an integration of the two approaches (Deuter et al, 2018). Furthermore, the initial introduction of an ALM-PLM integration requires extensive, complex and professional change management, as this change requires farreaching and comprehensive interventions in product development.…”
Section: Challenges Of Integrating Alm and Plmmentioning
confidence: 99%
“…Support for quality requirements such as functional safety from requirements to concept, models, realisation to validation, proof and acceptance In terms of implementing an ALM-PLM integration, concrete use cases and system requirements are necessary in addition to the business requirements. Deuter et al (2017) have developed a methodical procedure to systematically identify these use cases and requirements in the sense of a Systems Engineering approach. Based on the V-model of the VDI 2206 (VDI, 2021), four phases with ALM-PLM integration requirements were identified.…”
Section: Requirements For a Alm And Plm Integrationmentioning
confidence: 99%
See 1 more Smart Citation
“…Segundo Veld (2015), a inclusão de materiais sustentáveis na composição dos produtos é o primeiro passo para a inovação. Deuter et al (2018) salientam a importância de que as empresas invistam em produtos inteligentes de alta qualidade que melhorem o ciclo de vida dos produtos. Briand et al (2011) apresentam sensores ambientais fabricados em folha de plástico e o método de encapsulamento flexível associado ao nível da folha.…”
Section: Relação Entre Indústria 40 E Sustentabilidadeunclassified
“…Late implementation of these measures will certainly lead to losses which will require additional efforts on the part of the entire business sector. Industrial risks for product lifecycle management can be grouped into several categories [7,8]: -Statistical risks, these are a consequence of the imperfection of the means of production, the company covering them financially through the provisions set up.…”
Section: Introductionmentioning
confidence: 99%