Developing new equations for TBM performance prediction in carbonate-argillaceous rocks: a case history of Nowsood water conveyance tunnel

Abstract: Nowsood water conveyance tunnel is 49 km long and has been designed for transferring 70 m 3 /s water from Sirvan river southward to Dashte Zahab plain in the west of Iran. This long tunnel has been divided into three sections, namely 1A, 1B and 2. By April 2008, about 5.3 km of the lot 2 of this project, with a total length of 26 km, were excavated by a double-shield TBM. The bored section of tunnel passed through different geological units of three main formations of the Zagross mountain ranges which mainly c… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

1
31
0
2

Year Published

2015
2015
2023
2023

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 110 publications
(34 citation statements)
references
References 2 publications
(1 reference statement)
1
31
0
2
Order By: Relevance
“…During the construction phase and through back-mapping of the tunnel, predicted geological and geomechanical properties of rock mass along the tunnels were examined by detailed investigation of tunnel face (Hassanpour et al, 2009;Khademi Hamidi et al, 2010). In this stage, information such as rock type, rock mass fracturing, joint condition, characteristics of fault zones, weathering/alteration characteristics, ground water condition and rock stability information were recorded on mapping sheets.…”
Section: Tbm Performance Databasementioning
confidence: 99%
See 3 more Smart Citations
“…During the construction phase and through back-mapping of the tunnel, predicted geological and geomechanical properties of rock mass along the tunnels were examined by detailed investigation of tunnel face (Hassanpour et al, 2009;Khademi Hamidi et al, 2010). In this stage, information such as rock type, rock mass fracturing, joint condition, characteristics of fault zones, weathering/alteration characteristics, ground water condition and rock stability information were recorded on mapping sheets.…”
Section: Tbm Performance Databasementioning
confidence: 99%
“…To obtain the required data for analysis of TBM performance at Zgaros lot 1B & 2, results of studies performed during the preconstruction phase and construction phase have been compiled into a database (Hassanpour et al, 2009;Khademi Hamidi et al, 2010;Shahriar et al, 2009). During the construction phase and through back-mapping of the tunnel, predicted geological and geomechanical properties of rock mass along the tunnels were examined by detailed investigation of tunnel face (Hassanpour et al, 2009;Khademi Hamidi et al, 2010).…”
Section: Tbm Performance Databasementioning
confidence: 99%
See 2 more Smart Citations
“…Yagiz (2008) used rock mass properties in predicting TBM performance under the hard-rock condition. Hassanpour et al (2009) developed new equations for predicting the performance of hard-rock TBMs in carbonate-argillaceous rocks. Gehring (2009) carried out research on the influence of TBM design and machine features on performance and tool wear in rock.…”
mentioning
confidence: 99%