2022
DOI: 10.3390/machines10020133
|View full text |Cite
|
Sign up to set email alerts
|

Developing and Implementing a Lean Performance Indicator: Overall Process Effectiveness to Measure the Effectiveness in an Operation Process

Abstract: The purpose of this paper is to build up and implement a framework of a lean performance indicator with collaborative participation. A new indicator derived from OEE is presented, overall process effectiveness (OPE), which measures the effectiveness of an operation process. The action research (AR) methodology was used; collaborative work was done between researchers and management team participation. The framework was developed with the researchers’ and practitioners’ experiences, and the data was collected a… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(6 citation statements)
references
References 43 publications
0
6
0
Order By: Relevance
“…The development of the OMEE method to study the effectiveness of drilling rig is based on four steps: (i) acting, collecting information and data, (ii) observing, analyzing and reporting data, (iii) evaluating, evaluating and reviewing the process, and (iv) planning, identifying issues and suggesting solutions. This approach aligns with the methodology proposed in previous research [48]. The list of selected KPIs should assist in measuring the drilling rig performance behavior [49] and, subsequently, develop an appropriate method to analyze the mining process, identify poor performance and estimate improvement potential.…”
Section: Discussionmentioning
confidence: 76%
“…The development of the OMEE method to study the effectiveness of drilling rig is based on four steps: (i) acting, collecting information and data, (ii) observing, analyzing and reporting data, (iii) evaluating, evaluating and reviewing the process, and (iv) planning, identifying issues and suggesting solutions. This approach aligns with the methodology proposed in previous research [48]. The list of selected KPIs should assist in measuring the drilling rig performance behavior [49] and, subsequently, develop an appropriate method to analyze the mining process, identify poor performance and estimate improvement potential.…”
Section: Discussionmentioning
confidence: 76%
“…ODE presents itself as a valuable tool for performance indicators control. There are several published studies that present similar adaptations, endorsing the malleability of OEE according to the operational reality of productive chains and industrial sector in context (Corrales et al, 2022;Pintelon & Muchiri, 2008).…”
Section: Discussionmentioning
confidence: 76%
“…By integrating quality into the manufacturing process, process management seeks to minimize process variance (Sinha & Dhall, 2020). Effectiveness and efficiency of processes are crucial indicators of lean success (Ng et al, 2022).…”
Section: Process Managementmentioning
confidence: 99%