2014
DOI: 10.1007/s12205-013-0203-6
|View full text |Cite
|
Sign up to set email alerts
|

Developing an active resource allocation algorithm considering resource supply and demand in a construction site

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
7
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(7 citation statements)
references
References 7 publications
0
7
0
Order By: Relevance
“…Formula (2) indicates that the order of production processes in each project should meet process sequence requirements. Formula (3) indicates that the usage amount of resource k on day t is not less than lower limit of usage amount.…”
Section: Optimization Model Of Balanced Resource Consumption In Projementioning
confidence: 99%
See 2 more Smart Citations
“…Formula (2) indicates that the order of production processes in each project should meet process sequence requirements. Formula (3) indicates that the usage amount of resource k on day t is not less than lower limit of usage amount.…”
Section: Optimization Model Of Balanced Resource Consumption In Projementioning
confidence: 99%
“…In non-critical activity (1,1), (2,3), (3,3) and (3,5), production process (3,3) must be performed directly after (3,1) without postponing according to the process requirement. Thus, adjustment of production process (1,1), (2,3) and (3,3) is discussed here.…”
Section: Figure 1 Plan Network Diagram With Resource Allocationmentioning
confidence: 99%
See 1 more Smart Citation
“…With the implementation of the national rejuvenation strategy through science and education in the new era of information technology, the major task of higher education in China is to improve education quality and nurture high-quality talents. Information resources in college libraries serve for education and is an important aspect to measure the education quality (Kang, Moon, Min, Kim & Kim, 2015). And construction of such resources can influence the teaching quality to a certain extent.…”
mentioning
confidence: 99%
“…Many deterministic, probabilistic and heuristic methods are then employed. Recent studies, such as [1][2][3] recommend different algorithms as a solution to resource allocation and leveling problems. Asgari et al [1] proposed a multiple decision-maker resource-leveling models and stated cooperative game theory as an appropriate framework for analyzing joint resource management in construction.…”
mentioning
confidence: 99%