2015
DOI: 10.1007/s12205-015-2634-8
|View full text |Cite|
|
Sign up to set email alerts
|

Developing a probable cost analysis model for comparing bridge deck rehabilitation methods

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
4
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 8 publications
(6 citation statements)
references
References 6 publications
0
4
0
Order By: Relevance
“…The use of an SHM system has the potential to yield savings in inspection and maintenance operations. The inspection costs are associated with scheduled operations carried out at regular intervals, 41,42 while maintenance costs depend on the probability of damage detection. 16 The expected inspection costs at time t can be computed as…”
Section: Cost Analysis Of Bridges With Shm Systemsmentioning
confidence: 99%
“…The use of an SHM system has the potential to yield savings in inspection and maintenance operations. The inspection costs are associated with scheduled operations carried out at regular intervals, 41,42 while maintenance costs depend on the probability of damage detection. 16 The expected inspection costs at time t can be computed as…”
Section: Cost Analysis Of Bridges With Shm Systemsmentioning
confidence: 99%
“…Rehabilitation or repair has to be carried out when the structure reaches a critical limit state [5,42].…”
Section: Life-cycle Cost Analysis For Girder Bridgesmentioning
confidence: 99%
“…Several structures are reaching their design life in Europe and America, which leads the engineers to a new concern: the need to develop rehabilitation projects aiming to guarantee structural integrity and design life increase (Radomski, 2013). Rehabilitation is usually an attractive alternative, once it represents between 10% and 30% of the total cost of a similar new structure for most cases (Shim et al, 2015).…”
Section: The Challenges Of Rehabilitating the Hercilio Luz Suspensionmentioning
confidence: 99%