2020
DOI: 10.5267/j.ijiec.2020.6.002
|View full text |Cite
|
Sign up to set email alerts
|

Determining the fabrication runtime for a buyer-vendor system with stochastic breakdown, accelerated rate, repairable items, and multi-delivery strategy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
4
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 23 publications
0
4
0
Order By: Relevance
“…In addition, our model's utilization drops 60.7% compared to a model without using uptime-reduction strategies (Chiu et al, 2020). For a 33.25%, 41.16%, and 60.7% utilization decline, we are paying the prices of a 3.83%, 7.58%, and 14.91% increase in E[TCU(t1Z*)], respectively.…”
Section: The Effect Of Uptime-reduction Strategiesmentioning
confidence: 88%
See 1 more Smart Citation
“…In addition, our model's utilization drops 60.7% compared to a model without using uptime-reduction strategies (Chiu et al, 2020). For a 33.25%, 41.16%, and 60.7% utilization decline, we are paying the prices of a 3.83%, 7.58%, and 14.91% increase in E[TCU(t1Z*)], respectively.…”
Section: The Effect Of Uptime-reduction Strategiesmentioning
confidence: 88%
“…For α1 = 0.5 (as our example assumes), utilization drops 33.25%, from 0.2811 (without overtime option) to 0.1876.Implementing dual uptime-reduction strategies (namely, the options of overtime and outsourcing) creates significant utilization decline. Fig.9displays the outcome of a further analysis comparing our utilization with closely-relating models.In addition, our model's utilization drops 60.7% compared to a model without using uptime-reduction strategies(Chiu et al, 2020). For a 33.25%, 41.16%, and 60.7% utilization decline, we are paying the prices of a 3.83%, 7.58%, and 14.91% increase in E[TCU(t1Z*)], respectively.…”
mentioning
confidence: 88%
“…The researchers numerically validated their model, algorithm, and results. Recent works [11][12][13][14] also explored the influence of various rework/quality assurance strategies on different manufacturing-inventory systems. To cope with the client increasing trend on short order lead-time, production planners regularly use effective strategies, such as outsourcing and expedited manufacturing rate, to reduce their fabrication uptime.…”
Section: Survey Of Previous Researchmentioning
confidence: 99%
“…In the make-to-order environment, determining the production schedule is important [1][2][3][4][5][6][7][8][9][10]. This decision is made for satisfying various purposes, with the most common purpose being to meet the customer delivery due dates [1,4,[10][11][12][13][14][15]. Frequently, this production schedule decision is made in conjunction with other decisions.…”
Section: Introductionmentioning
confidence: 99%