2020
DOI: 10.1051/e3sconf/202016602004
|View full text |Cite
|
Sign up to set email alerts
|

Determination of the transfer step of the ore chute while mining the technogenic deposit of the bulk type

Abstract: Further development of the open mining works on the domestic enterprises will be accompanied by the worsening of mining-geological conditions and declining of the quality of iron ore raw materials. In the same time, the accumulated mining wastes, that can make the technogenic deposits, pass into one of the important sources of the mineral raw materials. Taking into account this thing, the development and implementation of the modern technological circuits of the technogenic deposit development is an actual cal… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
10
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 13 publications
(11 citation statements)
references
References 1 publication
1
10
0
Order By: Relevance
“…So, equation ( 9) can be written in the following form. (11) where: n -the number of not working shovelss during i blasting due to blasting work; i t -duration of i blasting work or duration of downtime time for one machine due to blasting; -loss of shovel's downtime for per hour, USD/hour; i V 0 -volume of rock mass to be fragmented during i blasting work, m 3 ; op bl C . -cost of blasting for one cubic meter of rock mass, USD/m3.…”
Section: Resultsmentioning
confidence: 99%
“…So, equation ( 9) can be written in the following form. (11) where: n -the number of not working shovelss during i blasting due to blasting work; i t -duration of i blasting work or duration of downtime time for one machine due to blasting; -loss of shovel's downtime for per hour, USD/hour; i V 0 -volume of rock mass to be fragmented during i blasting work, m 3 ; op bl C . -cost of blasting for one cubic meter of rock mass, USD/m3.…”
Section: Resultsmentioning
confidence: 99%
“…At the current stage of development of mining science, intensive research and industrial development of Ukraine's raw resources are being carried out [1][2][3][4][5]. The Rivne-Volyn region of Ukraine is rich in deposits of zeolite-smectite tuffs, which are of great interest to the industry of Ukraine.…”
Section: Features Of Occurrence Of Zeolite-smectite Tuffs In the Rivn...mentioning
confidence: 99%
“…A significant task of subsoil geometrization consists in increasing efficiency of drilling and blasting as an important factor for mining enterprise performance [28][29][30][31][32]. This task, in turn, is associated with that of monitoring the state of the rock massif [33][34][35][36][37] and closely related to methods of mining processes control [38][39][40][41][42].…”
Section: Introductionmentioning
confidence: 99%