Determination of Standard Time in Packaging Processing Using Stopwatch Time Study to Find Output Standard

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0
3

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
2
1

Relationship

0
8

Authors

Journals

citations
Cited by 11 publications
(9 citation statements)
references
References 0 publications
0
6
0
3
Order By: Relevance
“…The output standard for each work station can be found if the standard time has been obtained. To calculate the output standard, calculations can be used as follows [7] :…”
Section: Formula Descriptionmentioning
confidence: 99%
See 1 more Smart Citation
“…The output standard for each work station can be found if the standard time has been obtained. To calculate the output standard, calculations can be used as follows [7] :…”
Section: Formula Descriptionmentioning
confidence: 99%
“…In addition to being an advantage, of course, e-commerce is also a challenge for warehousing business partners to be better prepared to face it, and the study of processing time is the basis for various planning implementation strategies to be implemented [6]. Standard time is a rational time needed for a worker to complete his task in the work system [7]. Standard time is definitively expressed as the time needed by a worker who has an average level of ability to complete a job [8].…”
Section: Introductionmentioning
confidence: 99%
“…Method of timing by stop watch, i.e., snap back method [42] is used for time gathering purpose. Abnormal values during readings are recorded together with its causes of abnormality.…”
Section: Manual Approach For the First Iterationmentioning
confidence: 99%
“…Those values can be used in further analysis to improve processes. If those abnormalities occurrences are neglected, process times variations increase abnormally, which do not reflect the real process times [42]. The simplified method used includes only three causes of abnormality: the problem with tools, denoted as "T," the problem with parts, denoted as "Z," and bad material detected, denoted as "M." Detection of abnormalities and duration of those were important in further considerations for line balancing and for assembly improvement process on every WS.…”
Section: Manual Approach For the First Iterationmentioning
confidence: 99%
“…Tenaga kerja merupakan sumber daya dari perusahaan untuk memenuhi kebutuhan pasar, oleh karena itu perlu adanya pertimbangan beban kerja yang sesuai agar fungsi ini tetap berjalan dengan adil. Hal ini juga didesak dengan adanya proses produksi masal yang seringkali melakukan produksi selama 24 jam sehingga beban antar karyawan menjadi tinggi dan perlunya perhitungan waktu proses secara tepat [1] [2].…”
Section: Pendahuluanunclassified