The platform will undergo maintenance on Sep 14 at about 7:45 AM EST and will be unavailable for approximately 2 hours.
2014
DOI: 10.1016/j.renene.2013.09.003
|View full text |Cite
|
Sign up to set email alerts
|

Determination of reliability constrained optimal resource mix for an autonomous hybrid power system using Particle Swarm Optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
69
0

Year Published

2014
2014
2023
2023

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 131 publications
(73 citation statements)
references
References 25 publications
0
69
0
Order By: Relevance
“…FEE is net charge accumulated in the BESS at the end of time period of analysis and is expressed as the difference between the charge in BESS at the end and beginning of the analysis, which can be calculated by (10) [36] . They can be evaluated using (11)(12)(13)(14).…”
Section: Final Excess Energy (Fee)mentioning
confidence: 99%
See 1 more Smart Citation
“…FEE is net charge accumulated in the BESS at the end of time period of analysis and is expressed as the difference between the charge in BESS at the end and beginning of the analysis, which can be calculated by (10) [36] . They can be evaluated using (11)(12)(13)(14).…”
Section: Final Excess Energy (Fee)mentioning
confidence: 99%
“…Katsigiannis et al [11] have used Simulated Annealing (SA) and Tabu Search (TS) techniques to find optimum scheduling of small autonomous power system to reduce the cost of energy. Paliwal et al [12] have carried out the reliability analysis of isolated HRES in a rural area using PSO. Koutroulis et al [13] used Genetic Algorithm (GA) for optimization of a HES comprising of PV, WECS and diesel generator feeding a desalination system.…”
Section: Introductionmentioning
confidence: 99%
“…A reliability index is usually treated as either an objective [3] or a constraint [2], [4], [7], which can be evaluated using analytical methods [7]- [8], or Monte Carlo simulation [9], [10]. To consider the impacts of the volatility of power outputs of the distributed generators on the system reliability, multistate models are developed in [11], [12]- [13].…”
Section: Introductionmentioning
confidence: 99%
“…However, these studies have paid little attention to modeling of the BESS used to balance power for RESs. A probabilistic model for BESS is introduced in [7], [8], considering multiple states of state of charge (SOC) and probability associated with each state.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation