1976
DOI: 10.1109/t-pas.1976.32074
|View full text |Cite
|
Sign up to set email alerts
|

Determination of frequency decay rates during periods of generation deficiency

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1978
1978
2021
2021

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 25 publications
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…The program reportedly optimizes the system wide load shed schedule, also checking up its coordination with a steam turbine-generator underfrequency protection scheme. In [3], a method for determining the maximum probable rates at which a power system frequency will decay, following a disturbance, is presented. Such an analysis is chiefly directed to provide underfrequency protection for nuclear power plants.…”
Section: Introductionmentioning
confidence: 99%
“…The program reportedly optimizes the system wide load shed schedule, also checking up its coordination with a steam turbine-generator underfrequency protection scheme. In [3], a method for determining the maximum probable rates at which a power system frequency will decay, following a disturbance, is presented. Such an analysis is chiefly directed to provide underfrequency protection for nuclear power plants.…”
Section: Introductionmentioning
confidence: 99%