2010 the 2nd International Conference on Computer and Automation Engineering (ICCAE) 2010
DOI: 10.1109/iccae.2010.5451495
|View full text |Cite
|
Sign up to set email alerts
|

Determination of ATC with PTDF using linear methods in presence of TCSC

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
5
0

Year Published

2010
2010
2018
2018

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(5 citation statements)
references
References 13 publications
0
5
0
Order By: Relevance
“…Tracking back to Equations (1-9), the AC power transmission is primarily limited by the series reactive impedance of the transmission line. A series-connected can add a voltage in opposition to the transmission line voltage drop, therefore reducing the series line impedance [7][8][9].…”
Section: A Series Compensationmentioning
confidence: 99%
See 1 more Smart Citation
“…Tracking back to Equations (1-9), the AC power transmission is primarily limited by the series reactive impedance of the transmission line. A series-connected can add a voltage in opposition to the transmission line voltage drop, therefore reducing the series line impedance [7][8][9].…”
Section: A Series Compensationmentioning
confidence: 99%
“…The active power and reactive power at bus 2 are given by: (8,9) Equations (1)(2)(3)(4)(5)(6)(7)(8)(9) indicate that the active and reactive power/current flow can be regulated by controlling the voltages, phase angles and line impedance of the transmission system.…”
Section: Theory Of Compensationmentioning
confidence: 99%
“…The determination of power flow solution of the system which the optimal solution is the pre ATC calculation procedure. The combined economic dispatch with the proper constraints is solved mathematically with the help of co ordination equations which are used to develop a technique for determination of ATC [6][7][8][9][10][11][12].…”
Section: Introductionmentioning
confidence: 99%
“…The alternatives of the power system operation are restricted by the creation of new facilities to minimize the financial, social and environmental based problems. The better quality of service to the customer at the convenient price which the customer does not feel burden is the main motto [3][4][5][6][7][8].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation