2012
DOI: 10.1108/09699981211237139
|View full text |Cite
|
Sign up to set email alerts
|

Determinants of construction duration for building projects in Germany

Abstract: PurposeConstruction duration is referred to as one of the most crucial success elements for a construction project along with quality and cost. Modelling construction duration supports decision making at the early stages of a project. Exploring the complex structure of construction duration is necessary; hence this forms a basis to develop a predictive model. Therefore the main aim of this study is to determine the subset of variables for a descriptive model that explains the most substantial part of the varia… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

1
11
0

Year Published

2014
2014
2022
2022

Publication Types

Select...
8
1
1

Relationship

0
10

Authors

Journals

citations
Cited by 23 publications
(12 citation statements)
references
References 19 publications
1
11
0
Order By: Relevance
“…According to Dursun and Stoy (2012), the most reported determinant of construction duration in the literature is the cost of the project. This is largely due to the linkage of project cost to other determinants such as nature of construction site, number of levels, types of building projects and market condition.…”
Section: Discussionmentioning
confidence: 99%
“…According to Dursun and Stoy (2012), the most reported determinant of construction duration in the literature is the cost of the project. This is largely due to the linkage of project cost to other determinants such as nature of construction site, number of levels, types of building projects and market condition.…”
Section: Discussionmentioning
confidence: 99%
“…This was done to eliminate the effect of time and value on the various projects in a similar manner as in Dursun and Stoy (2012).…”
Section: Construction Time Overrunsmentioning
confidence: 99%
“…of stories above ground, no. of stories below ground, building coverage ratio, and construction region Dursun and Stoy (2012) 1695 Not Applicable All Gross floor area, construction cost, type of building, location, availability of building area, and market conditions Jarkas (2015) 187 Applicable Residential/Business Facility No. of stories above ground, no.…”
Section: No Of Data Casesmentioning
confidence: 99%