All Days 2010
DOI: 10.2118/132694-ms
|View full text |Cite
|
Sign up to set email alerts
|

Designing of Ultralight Slurry for Liner Cementation: Case Study

Abstract: Yaqut -1 well is located in Safed Koh Lease of Dewan Petroleum Pvt Ltd. The well was a Re-entry Well. Original well was drilled in 1984 and was classified as dry well. Dewan Petoleum decided to re-enter the same well and drill down 1356m of 6" hole to test the potential of Chiltan limestone as primary target and Sembar and Lower Goru sands as secondary targets. The Well is located in tectonically stressed/ active area with fractured formations with under-hydrostatic head. This is … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 7 publications
0
0
0
Order By: Relevance