2006
DOI: 10.1109/mim.2006.1664038
|View full text |Cite
|
Sign up to set email alerts
|

Designing for health - A methodology for integrated diagnostics/prognostics

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2007
2007
2016
2016

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 2 publications
0
4
0
Order By: Relevance
“…Beshears and Butler provide a detailed discussion of the entire Raytheon HMS Methodology in their paper titled "Designing For Health: A Methodology For Integrated Diagnostics / Prognostics". [9] An effective HMS Methodology must start early in the product life cycle with thorough system trade studies to derive HMS requirements. Once the HMS requirements have been comprehended, the Analysis / Design Influence stage addresses the identification of optimal candidates for diagnostic / prognostic technology insertion.…”
Section: Phm Methodology Overviewmentioning
confidence: 99%
“…Beshears and Butler provide a detailed discussion of the entire Raytheon HMS Methodology in their paper titled "Designing For Health: A Methodology For Integrated Diagnostics / Prognostics". [9] An effective HMS Methodology must start early in the product life cycle with thorough system trade studies to derive HMS requirements. Once the HMS requirements have been comprehended, the Analysis / Design Influence stage addresses the identification of optimal candidates for diagnostic / prognostic technology insertion.…”
Section: Phm Methodology Overviewmentioning
confidence: 99%
“…Raytheon developed a closed-loop health management systems (HMS) methodology to develop and field HMS capable products (Janasak and Beshears 2007). Raytheon’s HMS methodology contains five phases that span the product life cycle and follow the DoD 5000.2 Instruction: concept refinement, technology development, system development and demonstration, production and deployment, and operation and support (Beshears and Butler 2005). Key tasks for successful implementation of the HMS process were identified as trade studies to set up the HMS architecture, clear HMS requirements, product characterization through analysis, strategically-placed sensors, and data collection/maturation (Beshears and Butler 2005).…”
Section: Phm Frameworkmentioning
confidence: 99%
“…With reference to relevance of operating context to motor failure, a condition-monitoring data scheme can be developed to collect, record and analyse predictive maintenance data of motor under various operating contexts, where both an off-line monitoring and/or on-line monitoring data can be used (a sample sheet may be seen in Table III). For on-line recording, many process industries today use systems like CMMS or ERP systems (Zajicek et al, 2002;Carnero, 2003;Beshears and Butler, 2005;Hart, 2005;Kothamasu et al, 2006;Kumar and Chaturvedi, 2006) to collect and manage data in both real time as well as offline. The offline monitoring data can be hooked to DCS/network through portable data collectors.…”
Section: Maintenance Of Industrial Equipmentmentioning
confidence: 99%