1971
DOI: 10.1016/0003-682x(71)90017-x
|View full text |Cite
|
Sign up to set email alerts
|

Designing against noise from road traffic

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0
1

Year Published

1972
1972
2022
2022

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 39 publications
(4 citation statements)
references
References 7 publications
0
3
0
1
Order By: Relevance
“…Equivalent continuous sound level (¸C O ) and other indices have been used to describe the noise generated by road tra$c [1,2]. In his survey dealing with e!ects of road tra$c noise in Greater London under free-#ow conditions, Langdon [3] found that over the range of noise levels from 60 to 80 dB (A)¸ (the level exceeded or equalled for 10% of the measurement time), nuisance was found to be highly correlated with noise level measured as¸ over 24, 18 or 12 h and as¸C O over 24 h. Social surveys and "eld measurements [4] indicate a correlation between¸ , averaged over 18 h and human dissatisfaction.…”
Section: Introductionmentioning
confidence: 99%
“…Equivalent continuous sound level (¸C O ) and other indices have been used to describe the noise generated by road tra$c [1,2]. In his survey dealing with e!ects of road tra$c noise in Greater London under free-#ow conditions, Langdon [3] found that over the range of noise levels from 60 to 80 dB (A)¸ (the level exceeded or equalled for 10% of the measurement time), nuisance was found to be highly correlated with noise level measured as¸ over 24, 18 or 12 h and as¸C O over 24 h. Social surveys and "eld measurements [4] indicate a correlation between¸ , averaged over 18 h and human dissatisfaction.…”
Section: Introductionmentioning
confidence: 99%
“…Zatamnjivanjem, fasadni paneli pružaju pasivni način ograničavanje prekomernih solarnih dobitaka, i dobre mogućnosti kombinovanja modula sistema u uređajima za zatamnjivanje, a daju i manje rashladno opterećenje [12].…”
Section: Slika 3 -Polutransparentni Bists Ugrađeni U Dvostruki Omotač...unclassified
“…Although a lot of flora destruction occurred during the construction phase. Scholes and Sargent (1971) suggested design rules for estimating the effect of long noise barriers on the propagation of motorway noise peaks in terms of L 10 . Nelson and Godfrey (1974) studied the road traffic noise in rural environment.…”
Section: Perception Based Analysis Of Operational Mrts Corridormentioning
confidence: 99%