Abstract: Power systems include multiple units linked together to produce constantly moving electric power flux. Stability is very important in power systems, so controller systems should be implemented in power plants to ensure power system stability either in normal conditions or after the events of unwanted inputs and disorder. Frequency and active power control are more important regarding stability. Our effort focused on designing and implementing robust PID and PI controllers based on genetic algorithm by changing… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
10
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 11 publications
(10 citation statements)
references
References 20 publications
(7 reference statements)
0
10
0
Order By: Relevance
“…It's a reaction of a power source that has a speeder or an AFC. These frequency controllers will increase the power of generators in relation to the frequency [20,21].…”
Section: A Primary and Secondary Frequency Adjustmentmentioning
confidence: 99%
See 1 more Smart Citation
“…It's a reaction of a power source that has a speeder or an AFC. These frequency controllers will increase the power of generators in relation to the frequency [20,21].…”
Section: A Primary and Secondary Frequency Adjustmentmentioning
confidence: 99%
“…If the frequency will not go back to the allowed range after the primary adjustment process, the secondary adjustment will proceed. The secondary adjustment process is the process of the primary adjustment made through the effect of the Automatic Generating Center (AGC) system on a number of specified units, or a dispatch command [20,21]. The balance power equation will be rewritten as: is the maximum secondary power adjustment of the generator.…”
Section: A Primary and Secondary Frequency Adjustmentmentioning
confidence: 99%
“…In [12], for instance, the authors proposed a method in which the determination of the load shedding localization relies heavily on the two buses' phase angle sensitivity. More recently, however, several researchers have developed distinct load shedding methods, enabling to adjust the frequency and voltage within the required or demanded limits while reducing the amount of load shedding [13][14][15][16][17][18].…”
Section: Introductionmentioning
confidence: 99%
“…In singleobjective optimization models and multi-objective problems, the endeavor is to find a set of optimal solutions for conflicting objectives which are not necessarily superior corresponding to all objectives, called the non-dominated Pareto optimal solutions [19][20][21]. Utilizing evolutionary algorithms such as Non-dominated Sorting Genetic Algorithm (NSGA) [22][23][24][25], Multi-Colony ACO (MOACO) [26], and Multi-Objective Particle Swarm Optimization (MOPSO) [27,28], establishes a set of solutions which are subject to decision-makers' selection from the optimum. Although single-objective maintenance scheduling problems have been broadly addressed in the literature, the number of studies on multi-objective maintenance problems is quite limited.…”
Section: Introductionmentioning
confidence: 99%