2011
DOI: 10.5897/ijps11.365
|View full text |Cite
|
Sign up to set email alerts
|

Design, realization and optimization of a photovoltaic system equipped with analog maximum power point tracking (MPPT) command and detection circuit of the dysfunction and convergence the system (CDCS)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
14
0

Year Published

2012
2012
2022
2022

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 11 publications
(14 citation statements)
references
References 13 publications
0
14
0
Order By: Relevance
“… Digital MPPT controller allows the operating point of the PV panels to converge instantly to the maximum power point (MPP) [2,4].  The system of the charge/discharge control leads acid batteries.…”
Section: Synoptic Diagram Of the Systemmentioning
confidence: 99%
See 2 more Smart Citations
“… Digital MPPT controller allows the operating point of the PV panels to converge instantly to the maximum power point (MPP) [2,4].  The system of the charge/discharge control leads acid batteries.…”
Section: Synoptic Diagram Of the Systemmentioning
confidence: 99%
“…Concerning PV systems, the difficulties are the optimization of the power provided by PV panels, its transfer to the load (in our case Battery), good control of charge/discharge lead acid batteries and solar tracking PV panels [2,3]. The discrete blocks of regulation and control suggested are not reliable and induce power losses provided by PV panels [2][3][4], divergence of PV system [2][3][4], poor control of the charge/discharge batteries [5] and the collecting of illumination [6,7]. In the majority of PV systems, the major problem is the loss of power supplied by the PV panels because of inaccurate desired maximum power point (MPP) [8,9].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…These two issues require high performance PV systems with a very high efficiency. The classic PV systems (one or more PV panels with a single stage of adaptation provided with the MPPT command [1][2][3][4]) have a satisfactory efficiency; however, searching the maximum power point is more complex and requires a broader search to avoid operation around a false maximum power point (MPP). This could occur when there is an inhomogeneous sunlight or a dysfunction of the panels [5].…”
Section: Introductionmentioning
confidence: 99%
“…Currently, it is necessary to make an energy analysis for the buildings construction of different economic sectors through the professional application of technology by engineers and architects that design energy-efficient buildings. After finishing the design and construction of the building, electrical consumption is decided mainly by its control, maintenance and number of occupants; in order to achieve functional and satisfactory environments in intelligent buildings, the overall reduction in electrical consumption through control systems is required (Mrabti et al, 2011;Young-Sub and Kang-Soo, 2007). This improves the energy efficiency of electrical and control devices as well as the estimated algorithms of electric power consumption.…”
Section: Introductionmentioning
confidence: 99%