2011 Twenty-Sixth Annual IEEE Applied Power Electronics Conference and Exposition (APEC) 2011
DOI: 10.1109/apec.2011.5744671
|View full text |Cite
|
Sign up to set email alerts
|

Design optimization of grid-connected PV inverters

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0
1

Year Published

2012
2012
2018
2018

Publication Types

Select...
6
2

Relationship

3
5

Authors

Journals

citations
Cited by 27 publications
(7 citation statements)
references
References 38 publications
0
6
0
1
Order By: Relevance
“…[P lps,j (t, y) + P ld,j (t, y)] (9) where T A (t, y) ( • C) is the PV inverter ambient temperature at hour t (1 ≤ t ≤ 8760) of year y (1 ≤ y ≤ n), θ jc,ps and θ jc,d ( • C/W) are the thermal resistance from the junction to the case of the power switches and free-wheeling diodes, respectively, θ ca ( • C/W) is the thermal resistance of the heat sink, and P lps,i and P ld,i (W) are the total power loss (including conduction and switching power losses) of the ith (1 ≤ i ≤ p) power switch and free-wheeling diode, respectively.…”
Section: Pv Inverter Modeling For Optimization Including Reliabimentioning
confidence: 99%
See 1 more Smart Citation
“…[P lps,j (t, y) + P ld,j (t, y)] (9) where T A (t, y) ( • C) is the PV inverter ambient temperature at hour t (1 ≤ t ≤ 8760) of year y (1 ≤ y ≤ n), θ jc,ps and θ jc,d ( • C/W) are the thermal resistance from the junction to the case of the power switches and free-wheeling diodes, respectively, θ ca ( • C/W) is the thermal resistance of the heat sink, and P lps,i and P ld,i (W) are the total power loss (including conduction and switching power losses) of the ith (1 ≤ i ≤ p) power switch and free-wheeling diode, respectively.…”
Section: Pv Inverter Modeling For Optimization Including Reliabimentioning
confidence: 99%
“…), maximizing the amount of energy injected into the electric grid, and increasing its relia- bility by minimizing the number of failures of the PV system components which occur during the operational lifetime period of the PV installation [6], [7]. The energy injected into the electric grid can be maximized by applying an effective maximum power point tracker (MPPT) control strategy [8] and designing the PV inverter such that the PV array output power is efficiently processed by the PV inverter [9]. The reliability characteristics of the PV system components are usually expressed using indices such as the failure rate or the mean time between failures (MTBF) [7].…”
Section: Introductionmentioning
confidence: 99%
“…3. Depending on the PV system application domain, a Buck-type DC/DC power converter is used to interface the PV array output power to either a battery bank or a DC/AC inverter connected to the electric grid [30,31]. Both of these alternative types of DC/DC converter load are represented in Fig.…”
Section: The Proposed Global Mppt Systemmentioning
confidence: 99%
“…Hence, DCto-DC converters are beneficial in the case that the voltage between the primary sources of photovoltaic panels and DC-link (or the DC load) remain unstable. Such inverters need be with maximum power point tracking (MPPT) features [6,7] for optimizing the amount of electrical energy harvested from the photovoltaic array to DC-link (Common Coupling Point of Micro-Grid) or the DC load [8].…”
Section: Introductionmentioning
confidence: 99%