Our system is currently under heavy load due to increased usage. We're actively working on upgrades to improve performance. Thank you for your patience.
2020
DOI: 10.1080/00224065.2020.1834892
|View full text |Cite|
|
Sign up to set email alerts
|

Design of variance control charts with estimated parameters: A head to head comparison between two perspectives

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 8 publications
(4 citation statements)
references
References 31 publications
0
4
0
Order By: Relevance
“…In addition, in Table 10, we calculate the charting constants under the same conditions (guaranteeing an ICARL$ICARL$ of at least 370 with probability Ξ³0.28em=0.28emfalse{0.9,0.95,0.99false}$\gamma \; = {\rm{\;}}\{ {0.9,0.95,0.99} \}$) according to Guo and Wang [26] (also Sarmiento et al. [27]). From Tables 9 and 10, it is seen that the proposed charting constants are shifted to the right compared to the charting constants by Guo and Wang [26], which agrees with the finding made while comparing the corresponding TIs, that is, the TI by Sarmiento et al.…”
Section: Phase II Control Chartmentioning
confidence: 99%
See 2 more Smart Citations
“…In addition, in Table 10, we calculate the charting constants under the same conditions (guaranteeing an ICARL$ICARL$ of at least 370 with probability Ξ³0.28em=0.28emfalse{0.9,0.95,0.99false}$\gamma \; = {\rm{\;}}\{ {0.9,0.95,0.99} \}$) according to Guo and Wang [26] (also Sarmiento et al. [27]). From Tables 9 and 10, it is seen that the proposed charting constants are shifted to the right compared to the charting constants by Guo and Wang [26], which agrees with the finding made while comparing the corresponding TIs, that is, the TI by Sarmiento et al.…”
Section: Phase II Control Chartmentioning
confidence: 99%
“…Guo and Wang [26] proposed an EPC based equal-tailed two-sided control chart for 𝑆 2 . Sarmiento et al [27] provided more in-depth discussion about the control charts for 𝑆 2 .…”
Section: Phase II Control Chartmentioning
confidence: 99%
See 1 more Smart Citation
“…Some existing studies have suggested to design the control chart so that the desired IC performance can be achieved with the available amount of data (Diko et al, 2019;Epprecht et al, 2015;Faraz et al, 2018;Hu & Castagliola, 2017;Mosquera et al, 2019). There exist two perspectives in literature to design a control chart with specified IC performance; unconditional and conditional (Jardim et al, 2020, Kumar et al (2021, Kumar (2022), Sarmiento et al, 2020,). Under the unconditional perspective, the chart is design so that average of IC CARL (𝐢𝐴𝑅𝐿 𝑖𝑛 ) is equal to a desired nominal 𝐴𝑅𝐿 0 , i.e.…”
Section: Introductionmentioning
confidence: 99%