2021
DOI: 10.1051/e3sconf/202126801047
|View full text |Cite
|
Sign up to set email alerts
|

Design of OBD function test on production vehicle (PVE)

Abstract: Production Vehicle Evaluation (PVE) test mainly verifies the functionality of OBD system. PVE J2 test needs to verify the diagnostic mechanism for all the diagnostic Trouble Codes (DTC). While the design of fault simulation method is one of the technical difficulties of the whole PVE test. Due to the late start of PVE in China, test methods and technical skills are inadequate. This paper elaborates the failure monitoring principle and diagnosis mechanism of OBD system in detail,systematically introduces the PV… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…This implies that the OBD system must capable of recognize defects, activate MIL, and save the relative approved and permanent fault codes. The main goal of the J3 test is to gather the inuse monitoring performance tracking ratio (IUPR) [18]. In one study, data from the sensors is gathered, and then a fusion approach is used to assess the outcomes.…”
Section: Literature Reviewmentioning
confidence: 99%
“…This implies that the OBD system must capable of recognize defects, activate MIL, and save the relative approved and permanent fault codes. The main goal of the J3 test is to gather the inuse monitoring performance tracking ratio (IUPR) [18]. In one study, data from the sensors is gathered, and then a fusion approach is used to assess the outcomes.…”
Section: Literature Reviewmentioning
confidence: 99%