2013
DOI: 10.4028/www.scientific.net/amm.353-356.1364
|View full text |Cite
|
Sign up to set email alerts
|

Design of Blasting Scheme Based on Numerical Simulation

Abstract: Operating safety of adjacent pre-constructed pipeline must be insured when the crude oil and refined oil pipeline is under construction. Applying finite element method, the peak velocities of observed points located at test segment and operating segment of West to East Gas Transmission Pipeline were calculated, and the ratio of the two peak velocities in different relative positions was also obtained. Taking advantage of quantitative relationship between the detonation charge and vibration velocity of particle… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles