2011
DOI: 10.1049/iet-gtd.2010.0744
|View full text |Cite
|
Sign up to set email alerts
|

Design of a novel phasor measurement unit-based transmission line auto reclosing scheme

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
12
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 42 publications
(13 citation statements)
references
References 12 publications
0
12
0
Order By: Relevance
“…A PMU based technique [14], in which synchronized measurement of voltages and current phasors is carried out. Global Positioning Satellite (GPS) is implemented for communication between two modules [55,56].…”
Section: Frequency Domain Analysis Basedmentioning
confidence: 99%
See 1 more Smart Citation
“…A PMU based technique [14], in which synchronized measurement of voltages and current phasors is carried out. Global Positioning Satellite (GPS) is implemented for communication between two modules [55,56].…”
Section: Frequency Domain Analysis Basedmentioning
confidence: 99%
“…communication or both ends data based and noncommunication or local end data based methodologies. These methodologies can be further classified on the basis of time domain, frequency domain and timefrequency domains analysis [13][14][15][16][17]. In each of these methodologies, voltage, current or both signals are examined to discriminate between temporary and permanent faults and to detect the arc extinction instant.…”
Section: Introductionmentioning
confidence: 99%
“…Shunt reactors are widely used in high voltage transmission lines to improve power system stability and line voltage profile regulation [23]. The methods presented in [24][25][26][27][28][29][30] are effective for shunt compensation transmission lines. In these methods, the beat frequency generated after the quenching of the secondary arc was used to detect the quenching of the secondary arc.…”
Section: Introductionmentioning
confidence: 99%
“…The majority of ASPARs presented so far only used the measured data on one side of the transmission line, but references [12,13,30] required measured data on both sides of the transmission line. In [30], the presence of phasor measurement units (PMUs) on both sides of the transmission line was necessary to identify the type of fault and its clearance time.…”
Section: Introductionmentioning
confidence: 99%
“…The safe and stable operation of such lines must be guaranteed because they generally serve as the only power output channel of wind farms. Statistics illustrate that the majority of the transmission lines faults are single-phase-to-ground faults [7][8][9]. To enhance power supply continuity of wind-powered outgoing lines, SPAR is widely utilised on these lines.…”
Section: Introductionmentioning
confidence: 99%