Proceedings of Offshore Technology Conference 2009
DOI: 10.4043/otc-19951-ms
|View full text |Cite
|
Sign up to set email alerts
|

Design, Fabrication and Installation of the First Ever Reeled Pipe-In-Pipe System in Offshore Brazil

Abstract: The domestic demand of gas is increasing in Brazil. Petrobras is responding to this challenge by bringing several gas fields on stream offshore Brazil. Among them is the Canapu field, located east of the State of Espirito Santo, about 75 km off the coast, in a water depth of 1608 m. The produced gas is transported using a 20 km long pipe-in-pipe (PIP) system to the Cidade de Vitoria floating, production, storage and offloading system (FPSO) located in the Golfinho field to be processed and then exported onshor… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2012
2012
2012
2012

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 5 publications
0
3
0
Order By: Relevance
“…During stalk fabrication, the inner pipe and outer pipe stalks are fabricated separately. As described in [16], inner pipe stalks are transferred to the firing line in the spoolbase where insulation materials (in the form of short panels) are wrapped around the inner pipe and centralizers are bolted in place at predetermined intervals. The prefabricated inner pipe stalk is then inserted into the prefabricated outer pipe stalk using the pushing machine to make a PIP stalk.…”
Section: Special Consideration For Pip Systemsmentioning
confidence: 99%
See 2 more Smart Citations
“…During stalk fabrication, the inner pipe and outer pipe stalks are fabricated separately. As described in [16], inner pipe stalks are transferred to the firing line in the spoolbase where insulation materials (in the form of short panels) are wrapped around the inner pipe and centralizers are bolted in place at predetermined intervals. The prefabricated inner pipe stalk is then inserted into the prefabricated outer pipe stalk using the pushing machine to make a PIP stalk.…”
Section: Special Consideration For Pip Systemsmentioning
confidence: 99%
“…The prefabricated inner pipe stalk is then inserted into the prefabricated outer pipe stalk using the pushing machine to make a PIP stalk. Individual PIP stalks that are stored in the spoolbase are then spooled onto the reel, each connected by tie-in welds; see [16].…”
Section: Special Consideration For Pip Systemsmentioning
confidence: 99%
See 1 more Smart Citation