2020
DOI: 10.1016/j.enconman.2020.113427
|View full text |Cite
|
Sign up to set email alerts
|

Design and verification of a hermetic high-speed turbogenerator concept for biomass and waste heat recovery applications

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 13 publications
(2 citation statements)
references
References 39 publications
(45 reference statements)
0
2
0
Order By: Relevance
“…Based on industrial AMB-rotor systems presented in the literature (and comfortable control lift off and low frequency operation) a nominal overall force capacity of radial AMBs is selected as 5-7 times the gravity force, e.g., 6.24 in [26]. For vertical rotors this force capacity to rotor weight ratio can be lower, e.g., 1.13 in [27]. The feasible ratio value depends on uncertainties in process modelling, force nonlinearities, actuator and sensor noise and delays, machine assembly, and how they affect robust stability of the closed loop system.…”
Section: Sensormentioning
confidence: 99%
“…Based on industrial AMB-rotor systems presented in the literature (and comfortable control lift off and low frequency operation) a nominal overall force capacity of radial AMBs is selected as 5-7 times the gravity force, e.g., 6.24 in [26]. For vertical rotors this force capacity to rotor weight ratio can be lower, e.g., 1.13 in [27]. The feasible ratio value depends on uncertainties in process modelling, force nonlinearities, actuator and sensor noise and delays, machine assembly, and how they affect robust stability of the closed loop system.…”
Section: Sensormentioning
confidence: 99%
“…Industrial steam turbine has an advantage in various production processes that need both power and heat, which can achieve the purpose of energy‐saving. The industrial steam turbine has high speed and a wide range of power applications, the speed can be as high as 20 000 r/min and the power can be more than 10 MW 22 . The drum is one of the most important pieces of equipment in the boiler, 23 which is the connection hub of boiler heating, vaporization, and superheating.…”
Section: Aspen Plus Simulation Modelmentioning
confidence: 99%