Smart Energy Grid Engineering 2017
DOI: 10.1016/b978-0-12-805343-0.00012-7
|View full text |Cite
|
Sign up to set email alerts
|

Design and simulation issues for secure power networks as resilient smart grid infrastructure

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(6 citation statements)
references
References 104 publications
0
5
0
Order By: Relevance
“…Considering a typical operation time of commercial OCRs to be around 20 ms (in a 50 Hz system) [25], the proposed diagnosis scheme provides a solution by investigating the trajectory of ∆f (pu) and ∆V d (pu) within 5 ms (20 samples/cycle) window, to have a selective and fast decision such that the protection system remains unaltered. As the permissible limits of frequency deviation is commonly around ± 1% and that of voltage deviation is ± 5% from the rated value [26], the trajectory as per the proposed method lies within these allowable limits, as shown in Fig. 3.…”
Section: Proposed Anomaly Diagnosis Scheme -Modeling and Formal Guara...mentioning
confidence: 73%
“…Considering a typical operation time of commercial OCRs to be around 20 ms (in a 50 Hz system) [25], the proposed diagnosis scheme provides a solution by investigating the trajectory of ∆f (pu) and ∆V d (pu) within 5 ms (20 samples/cycle) window, to have a selective and fast decision such that the protection system remains unaltered. As the permissible limits of frequency deviation is commonly around ± 1% and that of voltage deviation is ± 5% from the rated value [26], the trajectory as per the proposed method lies within these allowable limits, as shown in Fig. 3.…”
Section: Proposed Anomaly Diagnosis Scheme -Modeling and Formal Guara...mentioning
confidence: 73%
“…However, their participation alongside BESS, decreases the share of BESS power injection/absorption for PFC, and consequently decreases the required power rating of the battery. The allowable range for frequency deviation from nominal frequency is ±1 pu [30]. The Genetic Algorithm (GA) is used to determine K BESS , K Dut_Fre and K LEDLLs to ensure that the frequency deviations remain within these allowable range while the most benefit is taken from the capacity of the PV and LEDLLs to participate in PFC to reduce the battery size.…”
Section: Novel and Optimal Battery Sizing Methodsmentioning
confidence: 99%
“…3 Using live and virtual systems in combination decreases production costs, especially in the defense industry. 4 Thanks to their advantageous combination, data distribution service for real-time systems (DDS) and high-level architecture (HLA) are frequently used together in various endeavors such as distributed traffic simulation, 5 hybrid software/hardware smart grid testbed, 6 and the integration of a forward air controller virtual simulator into a real-time environment for distributed simulations. 7 Since their application areas differ, various solutions have been developed for the interoperability of these two middleware standards.…”
Section: Gateway Federatementioning
confidence: 99%