2006 International Conference on Service Systems and Service Management 2006
DOI: 10.1109/icsssm.2006.320664
|View full text |Cite
|
Sign up to set email alerts
|

Design and Scheduling of Electroplating Facilities

Abstract: This paper tackles the Cyclic Hoists Scheduling Problem. This problem is often encountered in electroplating facilities when mass production is required. Then a repetitive sequence of moves is searched for the hoists. We more precisely deal with a global optimization problem that simultaneously considers the design and the scheduling of such production lines. It consists in studying systems integrating several transportation resources, called hoists, by minimizing the cycle time, while minimizing the number of… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
10
0

Year Published

2008
2008
2021
2021

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(10 citation statements)
references
References 8 publications
0
10
0
Order By: Relevance
“…Hence, to our best knowledge, the CHDSP with both objectives of minimizing the fleet size and minimizing the cycle time has only and first be tackled by Manier and Lamrous [1] and [28]. In these studies, the fleet size was a variable of the problem.…”
Section: State Of the Artmentioning
confidence: 99%
See 3 more Smart Citations
“…Hence, to our best knowledge, the CHDSP with both objectives of minimizing the fleet size and minimizing the cycle time has only and first be tackled by Manier and Lamrous [1] and [28]. In these studies, the fleet size was a variable of the problem.…”
Section: State Of the Artmentioning
confidence: 99%
“…The empty move based encoding approach [1] is a novel and interesting approach to encode the solutions for the CHDSP. Previous studies have always used the hoist loaded moves to encode the solutions.…”
Section: A the Empty Move Based Assignmentmentioning
confidence: 99%
See 2 more Smart Citations
“…The underlying idea is to be able to reconfigure the physical system in the event of series' change, in order to maintain optimal steady-state operation for each new production. In particular, our work focused on transport resources and we have previously studied joint optimization (minimization) of the couple number of hoists and cycle time [1], [2]. To the best of our knowledge, the joint optimization problem was not studied with both latter objectives together, and the idea is to provide a decision support system that enables to choose the best couple of parameters regarding productivity and cost objectives.…”
Section: Introductionmentioning
confidence: 99%