2016 IEEE 43rd Photovoltaic Specialists Conference (PVSC) 2016
DOI: 10.1109/pvsc.2016.7750278
|View full text |Cite
|
Sign up to set email alerts
|

Design and performance optimization of DG-solar hybrid SPV system for telecom applications

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…A large number of the PV installations used for powering telecom towers are in the peak capacity range of 4kWp to 8kWp (Kumar & Patil, 2016). It is also mentioned that for a specific location with a 4 kW peak telecom load, an 8.1kWp solar PV system can eliminate DG usage, provided, the grid is available for about 8 h per day.…”
Section: Solar Photovoltaics (Pv) Systemsmentioning
confidence: 99%
See 1 more Smart Citation
“…A large number of the PV installations used for powering telecom towers are in the peak capacity range of 4kWp to 8kWp (Kumar & Patil, 2016). It is also mentioned that for a specific location with a 4 kW peak telecom load, an 8.1kWp solar PV system can eliminate DG usage, provided, the grid is available for about 8 h per day.…”
Section: Solar Photovoltaics (Pv) Systemsmentioning
confidence: 99%
“…They mentioned that optimized solar PV systems helps to reduce the DG operation and reduce energy consumption from grid. Kumar et al (2016) Controller ------…”
Section: Pv Dg and Battery-based Systemmentioning
confidence: 99%