“…In (Klein, 2005), (Roth, 2009(Roth, , 2010 are considered both inputs and outputs, but cyclic sequences are supposed to be known. Techniques in (Giua 2005), (Cabasino, 2007), (Dotoli, 2011), (Cook, 2004)(van der Aalst, 2004, (Ould El Medhi, 2006, 2012 process as input data a language generated by the system, which is given as events sequences, regardless how the events are obtained from I/O data. Regarding our previous works (Estrada 2009), (Estrada 2010), the assumption about cyclic sequences as input data is dropped off in the current proposal, allowing addressing actual controlled DES.…”