All Days 2015
DOI: 10.4043/25844-ms
|View full text |Cite
|
Sign up to set email alerts
|

Design and Development of an HPHT Drillstem Testing Valve: A Case Study in HPHT Tool Design

Abstract: The past several decades have shown a steady trend of work performed in increasing well temperatures and pressures; however, the industry has been slow to adopt new methods in the design of equipment to be used for these wells. As a result, certain types of equipment are now insufficient for operations in high-pressure, high-temperature (HPHT) wells. This hinders the development of HPHT fields and reduces the ultimate recovery from those fields; technologies that are successfully used in conventional wells are… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles