2015 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) 2015
DOI: 10.1109/ieem.2015.7385710
|View full text |Cite
|
Sign up to set email alerts
|

Design and development of a performance evaluation system for the aircraft maintenance industry

Abstract: This paper aims at developing procurement Key Performance Indicators (KPI) system for Maintenance, Repair and Operation (MRO) items using a Business Intelligence tool. A set of typical KPI has been established in an aircraft maintenance enterprise through a case study. The result analyzed by business intelligence tools, has become a critical factor in evaluating the success of financial performance, quality assurance, order fill rate, utilization of productivity and development of knowledge hubs in the procure… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
8
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7
1

Relationship

2
6

Authors

Journals

citations
Cited by 11 publications
(8 citation statements)
references
References 7 publications
(7 reference statements)
0
8
0
Order By: Relevance
“…The decision variables 𝜑 𝑖 𝑝 𝑖 and 𝑧 𝑗𝑖𝑢 are binary variables in nature, as explained by the Constraints (11) and (12). Constraint set (13) indicates that 𝜏 𝑖𝑢 𝑝 𝑖 is a positive real number.…”
Section: Terminal Traffic Flow Problemmentioning
confidence: 99%
See 1 more Smart Citation
“…The decision variables 𝜑 𝑖 𝑝 𝑖 and 𝑧 𝑗𝑖𝑢 are binary variables in nature, as explained by the Constraints (11) and (12). Constraint set (13) indicates that 𝜏 𝑖𝑢 𝑝 𝑖 is a positive real number.…”
Section: Terminal Traffic Flow Problemmentioning
confidence: 99%
“…Decisionmakers can analyse the robustness and estimate their affordability of the worst-case outcome. Hence, the design of TTFP should needs to the robust approach to the inherent uncertainty when unanticipated delay is inevitable in practical situation of Air Traffic Control (ATC) performance [12,13].…”
Section: Introductionmentioning
confidence: 99%
“…Materials management in the warehouse is used to keep enough materials for maintenance purposes for the mobile robots, moveable racks, and charging stations. Furthermore, predictive maintenance could be measured under a long period of operations in the RMFS [109].…”
Section: ) Platform-as-a-servicementioning
confidence: 99%
“…However, specific plans for the assignment of aircraft to flights are based on a much shorter time span [5,14]. These plans minimise the idle time of aircraft fleets to maximise utilisation to cover the high purchase and maintenance costs of aircraft [15,16]. Flight schedule is disrupted when an aircraft cannot go on a scheduled flight due to various reasons, such as extreme weather or emergency maintenance.…”
Section: Introductionmentioning
confidence: 99%