Design and Construction of Asphalt Concrete Cutoff Structures in Earthfill Dams

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…The lower horizon of Euphrates formation represented by organogenic-clastic limestone and dolomite (6m) thick and mealy dolomite (10-14m) thick serve the formation of the channel portion of the dam [4]. In this study, the material properties for each material type, as shown in Table I, are collected from various references [5][6][7][8][9][10]. Some input parameters required by the analysis not found directly in the adopted references were either arrived at or for unavailable data assumed within reasons.…”
Section: Geological Features Of Dam Foundationmentioning
confidence: 99%
“…The lower horizon of Euphrates formation represented by organogenic-clastic limestone and dolomite (6m) thick and mealy dolomite (10-14m) thick serve the formation of the channel portion of the dam [4]. In this study, the material properties for each material type, as shown in Table I, are collected from various references [5][6][7][8][9][10]. Some input parameters required by the analysis not found directly in the adopted references were either arrived at or for unavailable data assumed within reasons.…”
Section: Geological Features Of Dam Foundationmentioning
confidence: 99%