2004
DOI: 10.1680/geng.157.4.173.51830
|View full text |Cite
|
Sign up to set email alerts
|

Design and construction of a deep shaft for Crossrail

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2019
2019

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…Despite its increasing use, this type of complex solution and construction methodology (Andrade et al, 2004;Morrison et al, 2004;Campanhã & Kuwajima, 2008;Vincenza et al, 2012) has not been studied in detail (França et al, 2006;Tavares et al, 2010). Consequently, its interaction with the soil remains, to a certain degree, unknown.…”
Section: Introductionmentioning
confidence: 99%
“…Despite its increasing use, this type of complex solution and construction methodology (Andrade et al, 2004;Morrison et al, 2004;Campanhã & Kuwajima, 2008;Vincenza et al, 2012) has not been studied in detail (França et al, 2006;Tavares et al, 2010). Consequently, its interaction with the soil remains, to a certain degree, unknown.…”
Section: Introductionmentioning
confidence: 99%