2014
DOI: 10.4324/9781315844749
|View full text |Cite
|
Sign up to set email alerts
|

Design and Build Contract Practice

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
5
0

Year Published

2017
2017
2020
2020

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(6 citation statements)
references
References 0 publications
1
5
0
Order By: Relevance
“…In overall, this system provides clear accountability and better design and construction control by the owner (Abdul Rashid, et al, 2006). In DB, higher level of owner's involvement is required as the owner will directly deals with the contractor on any matters and issues related to the project, especially design without mediating consultants (Turner, 1995;Murdoch & Hughes, 2008). Risks that are associated to the project which are transferred by the owner to the contractor in this system are more than any other procurement approach (Muhammed, 2005).…”
Section: Procurement Methods and Their Characteristicsmentioning
confidence: 99%
See 1 more Smart Citation
“…In overall, this system provides clear accountability and better design and construction control by the owner (Abdul Rashid, et al, 2006). In DB, higher level of owner's involvement is required as the owner will directly deals with the contractor on any matters and issues related to the project, especially design without mediating consultants (Turner, 1995;Murdoch & Hughes, 2008). Risks that are associated to the project which are transferred by the owner to the contractor in this system are more than any other procurement approach (Muhammed, 2005).…”
Section: Procurement Methods and Their Characteristicsmentioning
confidence: 99%
“…DB is a method in which the owner retains both design and construction services in the same contract from a single legal entity referred to as the design-builder (Molenaar, et al, 2009). In DB, the central contractual position between owner and contractor is simplified as the design and construction are contractually one package supplied from contractor to owner (Turner, 1995). Based on the owner's need statement, tenderers submit complete proposal for the design, construction and commissioning of the project.…”
Section: Introductionmentioning
confidence: 99%
“…Turner also conducted surveys of contractors, designers, and building clients regarding design build issues in the UK [19]. He suggested that there was no evidence to indicate any differences in the prices tendered under either DB or traditional methods.…”
Section: Impact Of Db Project Delivery On Costmentioning
confidence: 99%
“…Characterised by its design-construction integration, guaranteed price, short on-site construction phase and single point responsibility, it apportions responsibility for the end product clearly to the principal contractor. The need to move towards more closely integrated procurement has been discussed for many years and is founded in the problems with traditional procurement; poor relationships between contractual parties, project over run, cost uncertainty, contested claims and litigious actions (Banwell, 1964;Turner, A., 1990;Latham, 1994;Turner, D.F. , 1995).…”
Section: Design and Buildmentioning
confidence: 99%