“…Also, the extensive pipe work for water cooling of the plasma vessel and ports, and the complex helium pipe work for the cryogenics, i.e. for cooling the superconducting coils, the bus-bars, the current leads, central support structure, and the thermal shields [10] have to be leak checked and tightness has to be confirmed. This latter part of the leak tests has already a time overlap with the first cryogenic tests, since a variation of the helium pressure in the lines is desired.…”