Desenho De Poligonos E Sequenciamento De Blocos De Minério Para Planejamento De Curto Prazo Em Função Da Distribuição Dos Teores Para Mineração a Céu Aberto

Abstract: Resumo Na mineração a céu aberto, na etapa de planejamento a curto prazo são desenhados constantemente polígonos usados no planejamento de produção, onde geralmente o processo de desenho é manual, demandando o tempo e esforço dos planejadores. Os polígonos gerados no planejamento de curto prazo devem apresentar a menor variabilidade possível entre eles, para que as restrições da planta de processamento sejam atendidas. Desenhar polígonos de curto prazo de forma automática, sequenciar todos os blocos de minério… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(3 citation statements)
references
References 1 publication
0
3
0
Order By: Relevance
“…The decision about which blocks should be sent to the concentration plant or the blending/homogenization piles is made based on polygons known as dig-lines, obtained by manual design, largely dependent on the ability of the mine planning engineer. The manual design of each dig-line is limited and does not allow the exploration of different possibilities (Toledo et al, 2017). Also, the manual definition of the dig-lines has the limitation of considering only one variable at a time (usually).…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…The decision about which blocks should be sent to the concentration plant or the blending/homogenization piles is made based on polygons known as dig-lines, obtained by manual design, largely dependent on the ability of the mine planning engineer. The manual design of each dig-line is limited and does not allow the exploration of different possibilities (Toledo et al, 2017). Also, the manual definition of the dig-lines has the limitation of considering only one variable at a time (usually).…”
Section: Introductionmentioning
confidence: 99%
“…This limitation cannot achieve the technological characteristics demanded by the processing plant, if multiple variables must be considered simultaneously. Another aspect being ob-served is that even if the mean grade in the dig-lines matches the short-term mining planning target, the grades can fluctuate within the dig-lines, causing a reduction in the performance of the processing plant (Toledo et al, 2017). There are some solutions in this area based on modern mixed integer programming (MIP).…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation