ASME 1977 International Gas Turbine Conference and Products Show 1977
DOI: 10.1115/77-gt-2
|View full text |Cite
|
Sign up to set email alerts
|

Description, Output and Development Prospects of a 750 C Helium Direct Cycle Nuclear Power Plant With a Single Turbomachine and Intermediate Cooling

Abstract: The concept of a helium cycle nuclear power plant with a single turbomachine located outside the P.C.R.V. in a leaktight basement is being studied. Main features of the system are pointed out, as are the favorable aspects it offers for a satisfactory design of the plant, a high safety level, a good efficiency for electricity generation associated with a dry cooling tower and heat recovery in good conditions for heating or industrial purposes. Above all, the high technological credibility due to the temperature… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

1980
1980
1980
1980

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…An increase in tube wall thickness by a factor as much as 1.9 is required when air working fluid is used instead of helium in a radiant furnace system. 6. In this paper, only the characteristic requirements and the effects of the working fluids on the CCGT cycle performance and the various component designs were covered.…”
Section: Safetymentioning
confidence: 99%
See 1 more Smart Citation
“…An increase in tube wall thickness by a factor as much as 1.9 is required when air working fluid is used instead of helium in a radiant furnace system. 6. In this paper, only the characteristic requirements and the effects of the working fluids on the CCGT cycle performance and the various component designs were covered.…”
Section: Safetymentioning
confidence: 99%
“…5), and France (Ref. 6) on utilizing helium gas turbines for high-temperature, gas-cooled reactors (HTGR). A fossil-fueled pilot helium CCGT powerplant was completed in 1976 and has since been in operation in Germany (Ref.…”
Section: Introductionmentioning
confidence: 99%