Demonstration Plant of the Kawasaki CO2 Capture (KCC) System with Solid Sorbent for Coal-Fired Power Station

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The CO 2 purity is around 95% with capture efficiency of 55%. Later, they scaled up to 40 t of CO 2 per day with more than 100 h tests at a coal firing facility that can process 7200 N m 3 /h flue gas . Due to its moving bed configuration with low gas velocity to avoid fluidization, equipment size was around 14.5 m long, 7.5 m wide and 39.5 m high.…”
Section: Co2 Capture Process Based On Solid Amine–silica Adsorbentsmentioning
confidence: 99%
See 1 more Smart Citation
“…The CO 2 purity is around 95% with capture efficiency of 55%. Later, they scaled up to 40 t of CO 2 per day with more than 100 h tests at a coal firing facility that can process 7200 N m 3 /h flue gas . Due to its moving bed configuration with low gas velocity to avoid fluidization, equipment size was around 14.5 m long, 7.5 m wide and 39.5 m high.…”
Section: Co2 Capture Process Based On Solid Amine–silica Adsorbentsmentioning
confidence: 99%
“…Later, they scaled up to 40 t of CO 2 per day with more than 100 h tests at a coal firing facility that can process 7200 N m 3 / h flue gas. 124 Due to its moving bed configuration with low gas velocity to avoid fluidization, equipment size was around 14.5 m long, 7.5 m wide and 39.5 m high. To minimize the equipment size, a fluidized bed is another good option.…”
Section: Co 2 Capture Process Based On Solidmentioning
confidence: 99%