Demand response in blocks of buildings: opportunities and requirements

Abstract: Increased Demand Response (DR) is essential to fully exploit European power systems, which in turn is an absolute prerequisite for meeting European targets related to energy efficiency and climate change. Essentially DR involves consumers reducing or shifting their electricity usage during periods of peak electricity demand in response to time-based tariffs or other forms of financial incentives. The opportunities for realising demand response vary across Europe as they are dependent on the particular regulato… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
30
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
5
2

Relationship

3
4

Authors

Journals

citations
Cited by 20 publications
(30 citation statements)
references
References 13 publications
0
30
0
Order By: Relevance
“…The DR-BOB solution has been piloted at four demonstration sites: two university campuses (one in Middlesbrough in the UK and one in Cluj Napoca in Romania), a business park in Anglet (Technology campus Anglet) in France, and a private hospital in Brescia in Italy. With local variations in the exact organisation of the elements, the technical part includes the following elements [1]:…”
Section: The 4 Demonstration Sites Of the Dr Bob Projectmentioning
confidence: 99%
“…The DR-BOB solution has been piloted at four demonstration sites: two university campuses (one in Middlesbrough in the UK and one in Cluj Napoca in Romania), a business park in Anglet (Technology campus Anglet) in France, and a private hospital in Brescia in Italy. With local variations in the exact organisation of the elements, the technical part includes the following elements [1]:…”
Section: The 4 Demonstration Sites Of the Dr Bob Projectmentioning
confidence: 99%
“…The DR-BoB project aims to provide and validate a method of assessing levels of technology readiness related to the technologies required for consumers' facilities managers, buildings and the local energy infrastructure to participate in the DR energy management solution at any given site [8]. Currently the following four technology readiness levels are defined:…”
Section: Demand Response Technology Readiness Levelmentioning
confidence: 99%
“…The degree to which the DR-BoB energy management solution can increase the ability of any given site to participate in DR is dependent upon the pre-existing energy systems, i.e., the energy metering, telemetry and control systems, and local power generation and storage plant [8]. The value proposition for the DR-BoB solution is obviously dependent on the available revenue sources, which are discussed in detail elsewhere [9].…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations