2009
DOI: 10.14358/pers.75.1.87
|View full text |Cite
|
Sign up to set email alerts
|

DEM Generation Using a Digital Large Format Frame Camera

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
22
0

Year Published

2012
2012
2022
2022

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 35 publications
(23 citation statements)
references
References 1 publication
1
22
0
Order By: Relevance
“…ArcHydro ® was developed as an extension of ArcGIS software, which is suitable for the delineation of watershed boundaries [17]. DEM is a necessary input data for spatial analysis and could be generated using different techniques such as photogrammetry [19,20], interferometry [21], laser scanning [22] and topographic surveys [23].…”
Section: Methodsmentioning
confidence: 99%
“…ArcHydro ® was developed as an extension of ArcGIS software, which is suitable for the delineation of watershed boundaries [17]. DEM is a necessary input data for spatial analysis and could be generated using different techniques such as photogrammetry [19,20], interferometry [21], laser scanning [22] and topographic surveys [23].…”
Section: Methodsmentioning
confidence: 99%
“…The height values are based on Earth Gravitational Model of 1996 (EGM96) geoid, and the dataset is referenced horizontally to the World Geodetic System of 1984 (WGS84) ellipsoid [11]. ASTER GDEM was generated using stereo-pair images collected by the ASTER instruments, which is one of major photogrammetric techniques to generate DEMs or any topographic data [12]. Similar to SRTM, the height values are based on WGS84 EGM96 geoid, and the dataset is referenced horizontally to the WGS84 ellipsoid [13].…”
Section: Demmentioning
confidence: 99%
“…Other investigations were carried out in (Höhle, 2009a) and (Höhle, 2009b) using UltraCam-D and DMC images. The results from these investigations will be used for estimating the impact of the four new digital aerial cameras.…”
Section: Geometric Accuracymentioning
confidence: 99%
“…For example, in (Höhle 2009a) the parallax accuracy has been determined for the UC-D camera (c=101mm, pel'=9µm, b/h=0.27 at p=60%, s' fld =7500pixel) under similar conditions (GSD=6cm, p=60%, q=20%, processing with Match-T) and the parallax accuracy has been σ px' =6.0 µm or 0.67. The average from all three tests is (σ px' /pel') average =0.46 ≈ 0.5.…”
Section: Geometric Accuracymentioning
confidence: 99%