Delay Analysis Method Using Delay Section

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
24
0

Year Published

2008
2008
2017
2017

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 39 publications
(24 citation statements)
references
References 5 publications
0
24
0
Order By: Relevance
“…The popular schedule delay analysis methods include as-planned vs as-built, impacted as-planned, the collapsed as-built, isolated delay types, window but-for technique, isolated collapsed as-built and critical path effect based delay analysis method [3,[7][8][9][11][12][13][14][15].…”
Section: Schedule Delay Analysis Methodsmentioning
confidence: 99%
“…The popular schedule delay analysis methods include as-planned vs as-built, impacted as-planned, the collapsed as-built, isolated delay types, window but-for technique, isolated collapsed as-built and critical path effect based delay analysis method [3,[7][8][9][11][12][13][14][15].…”
Section: Schedule Delay Analysis Methodsmentioning
confidence: 99%
“…In this method delay credited to one side is added to the as-planned schedule and resulted delay on project duration is calculated. Same process is performed for other side (Kim et al 2005).…”
Section: What-if and But-for Methodsmentioning
confidence: 99%
“…This method subtracts the delay credited to the owner from the as-built schedule. The time difference between the as-built schedule and bu-for schedule is the compensable delay (Kim et al 2005).…”
Section: What-if and But-for Methodsmentioning
confidence: 99%
See 2 more Smart Citations