Day 3 Wed, October 02, 2013 2013
DOI: 10.2118/166501-ms
|View full text |Cite
|
Sign up to set email alerts
|

Deepwater Wells Top Hole Cement Volume Evaluation using Innovative Hole Size Inversion from LWD Propagation Resistivity Measurements

Abstract: Following the Gulf of Mexico Deepwater drilling moratorium in 2010, the industry focus towards well integrity assurance has significantly increased. Several new and updated regulations and best practices have been published in the last two years, including API Standard 65 -Part 2 and API RP 96. These two industry accepted standards highlighted that determining the hole volume to confirm the cement slurry volume, to fill-up the annulus to the designed top of cement, is one of the many factors impacting cement p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2018
2018

Publication Types

Select...
3
1

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…The biggest risk reported is that of shallow flow, for example, by Bogaerts et al (2012b), and they, as well as other authors (Withfill et al 2000;O'Leary et al 2004), have discussed how to mitigate the risk of shallow slows. Peternell et al (2013) considered how to estimate the cement volumes needed. Improved oversight and continuous improvements have led to increased quality of cementing operations in deepwater environments , Bogaerts et al 2012a, but all of these efforts and mitigations will be compromised somewhat when thief zones are taking fluids instead of bringing the cement level up.…”
Section: Introductionmentioning
confidence: 99%
“…The biggest risk reported is that of shallow flow, for example, by Bogaerts et al (2012b), and they, as well as other authors (Withfill et al 2000;O'Leary et al 2004), have discussed how to mitigate the risk of shallow slows. Peternell et al (2013) considered how to estimate the cement volumes needed. Improved oversight and continuous improvements have led to increased quality of cementing operations in deepwater environments , Bogaerts et al 2012a, but all of these efforts and mitigations will be compromised somewhat when thief zones are taking fluids instead of bringing the cement level up.…”
Section: Introductionmentioning
confidence: 99%