1945
DOI: 10.1130/0016-7606(1945)56[39:dsciwk]2.0.co;2
|View full text |Cite
|
Sign up to set email alerts
|

Deep Solution Channel in Western Kentucky

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

1948
1948
2021
2021

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…To explore the effects weak points in a grout curtain used, a simplified model was set up in RS2 with the geologic context of the Kentucky Lock for an excavation. The context of this site was chosen because: 1) Kentucky Lock and Dam have previously explored significant ver tical karst features (Moneymaker, 1941) and (Moneymaker & Rhodes, 1945), 2) the current construction of the new lock has exposed large areas of part of the lock foundation and 3) grouting was successfully used in a vertical feature below the upstream cofferdam to prevent excessive water infiltration and 4) the lock foundation and cofferdams are placed on one unit of limestone. Figure 2 below on the right shows the vertical features that were located beneath the upstream cofferdam and where conventional and jet grouting were successfully used to provide seepage.…”
Section: Geology and Context Of The Kentucky Lock Sitementioning
confidence: 99%
See 1 more Smart Citation
“…To explore the effects weak points in a grout curtain used, a simplified model was set up in RS2 with the geologic context of the Kentucky Lock for an excavation. The context of this site was chosen because: 1) Kentucky Lock and Dam have previously explored significant ver tical karst features (Moneymaker, 1941) and (Moneymaker & Rhodes, 1945), 2) the current construction of the new lock has exposed large areas of part of the lock foundation and 3) grouting was successfully used in a vertical feature below the upstream cofferdam to prevent excessive water infiltration and 4) the lock foundation and cofferdams are placed on one unit of limestone. Figure 2 below on the right shows the vertical features that were located beneath the upstream cofferdam and where conventional and jet grouting were successfully used to provide seepage.…”
Section: Geology and Context Of The Kentucky Lock Sitementioning
confidence: 99%
“…The Importance of Rock Structure and Infilling for Grout Curtain Installation in Karst Where there are significant vertical discontinuities in the rock such as near vertical faults, joints, steeply inclined bedding or valley stress relief features, there may be significant develop ment of vertical karst features such as those seen at Center Hill Dam (USACE, 2012) and beneath Kentucky Lock (Moneymaker & Rhodes, 1945). These can interact with near horizon tal features such as bedding to produce the complicated karst development.…”
Section: Introductionmentioning
confidence: 99%