2022
DOI: 10.1016/j.ijepes.2021.107895
|View full text |Cite
|
Sign up to set email alerts
|

Day-ahead interval optimization for CCHP system considering uncertainty of wind power and PV

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 43 publications
(12 citation statements)
references
References 27 publications
0
12
0
Order By: Relevance
“…Gas turbine operating costs include operating costs, start-up and shutdown costs and environmental costs [29]. They can be defined as follows:…”
Section: Objective Functionmentioning
confidence: 99%
“…Gas turbine operating costs include operating costs, start-up and shutdown costs and environmental costs [29]. They can be defined as follows:…”
Section: Objective Functionmentioning
confidence: 99%
“…This article refers to the typical daily cooling, heating, and electricity load demand curves in ref and the 24 h time-of-use electricity price curve in ref , used to construct the basic environmental data and related parameters of the system. The wind power generation prediction curve and 24 h DNI prediction curve in this article are generated from a large number of scenarios using Latin hypercube sampling and then obtained by considering the synchronous backpropagation of Kantorovich distance to eliminate the scenarios.…”
Section: Example Analysismentioning
confidence: 99%
“…Electrical power generation from PV array and WT farm is highly uncertain and is affected by solar irradiance and wind speeds [41][42][43][44]. Accordingly, the accurate modeling of the generators of the PV panels and the wind turbine is essential.…”
Section: Modeling Of Renewable Energy Uncertaintymentioning
confidence: 99%