2020 IEEE PES Transmission &Amp; Distribution Conference and Exhibition - Latin America (T&D LA) 2020
DOI: 10.1109/tdla47668.2020.9326170
|View full text |Cite
|
Sign up to set email alerts
|

Current Transformer Modeling for Electromagnetic Transient Simulation in Protection Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 9 publications
0
3
0
Order By: Relevance
“…Evaluasi eksperimental dari model CT diimplementasikan menggunakan EMTP, dimana model yang dikembangkan pada program EMTP memberikan hasil yang sangat memuaskan untuk sebagian besar kasus (Ahamed & Rao, 2015) (Syahputra, 2015). Salah satu perangkat lunak yang cukup populer dalam bidang sistem tenaga listrik adalah Electromagnetic Transients Program (ATP) yang merupakan versi dari EMTP adalah alat yang mampu digunakan untuk mengevaluasi unjuk kerja transformator arus (Afonso et al, 2020a) (Afonso et al, 2020b) (Georgiev et al, 2021).…”
Section: Pendahuluanunclassified
“…Evaluasi eksperimental dari model CT diimplementasikan menggunakan EMTP, dimana model yang dikembangkan pada program EMTP memberikan hasil yang sangat memuaskan untuk sebagian besar kasus (Ahamed & Rao, 2015) (Syahputra, 2015). Salah satu perangkat lunak yang cukup populer dalam bidang sistem tenaga listrik adalah Electromagnetic Transients Program (ATP) yang merupakan versi dari EMTP adalah alat yang mampu digunakan untuk mengevaluasi unjuk kerja transformator arus (Afonso et al, 2020a) (Afonso et al, 2020b) (Georgiev et al, 2021).…”
Section: Pendahuluanunclassified
“…Calculations of the secondary current as a function of time at the short-circuit current in the primary circuit of the current transformer were performed using the field-circuit method with three-dimensional space-time analysis [30][31][32][33].…”
Section: Mathematical Model Of the Current Transformermentioning
confidence: 99%
“…Moreover, in the case of the accidental opening of the secondary terminals of the current transformer, a very high voltage would be induced in the secondary winding [19,20]. With the use of numerical methods [21][22][23][24][25][26][27][28] and space-time analysis of 3D electromagnetic fields, it is possible to check the operation of a short-circuit current transformer during short circuits before testing a prototype at the design change, i.e., the currents at an asymmetrical short circuit [29][30][31][32].…”
Section: Introductionmentioning
confidence: 99%
“…For example, they are characterized vs. frequency and for power quality (PQ) applications in [ 8 , 9 ] and [ 10 , 11 ], respectively. Modeling is used in [ 12 ] for Rogowski coils, in [ 13 ] for an innovative current transformer (CT), and in [ 14 ] for legacy CTs. In [ 15 ], LPITs are characterized inside a realistic measurement chain containing phasor measurement units (PMUs).…”
Section: Introductionmentioning
confidence: 99%