2016
DOI: 10.1016/j.fusengdes.2015.12.034
|View full text |Cite
|
Sign up to set email alerts
|

Current design of the European TBM systems and implications on DEMO breeding blanket

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
7
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 18 publications
(10 citation statements)
references
References 5 publications
0
7
0
Order By: Relevance
“…A simplified layout of the system is reported in Figure 1. The PbLi loop [6] includes the following components: the Tritium Extraction Unit (TEU), the Heater (HT), the Cooler (HX), the Cold Trap (CT), the Storage/Recirculation Tank (ST), the Circulation Pump (PL1) and the Relief Tank (RT). Reading the layout from the left to the right side the first component is the WCLL TBM.…”
Section: The Pbli Ancillary Systemmentioning
confidence: 99%
See 2 more Smart Citations
“…A simplified layout of the system is reported in Figure 1. The PbLi loop [6] includes the following components: the Tritium Extraction Unit (TEU), the Heater (HT), the Cooler (HX), the Cold Trap (CT), the Storage/Recirculation Tank (ST), the Circulation Pump (PL1) and the Relief Tank (RT). Reading the layout from the left to the right side the first component is the WCLL TBM.…”
Section: The Pbli Ancillary Systemmentioning
confidence: 99%
“…According to [6], during normal operation the PbLi flows out the TBM entering in the related ancillary system with a temperature of about 330°C and a nominal mass flow rate of 0.29 Kg/s. By following the pipeline from P01 to P02 the alloy reaches the heater where the temperature is increased up to 450°C and then enters inside the TEU.…”
Section: P03mentioning
confidence: 99%
See 1 more Smart Citation
“…In the 2000s, the U.S. proposed a DCLL TBM for ITER [33]. A number of deliverables were produced, addressing the different physical phenomena in ITER TBMs and how the data could be extrapolated to DEMO conditions [34][35][36]. Other related activities focused on the development of sensors for ITER TBMs and the associated strategies [37].…”
Section: Tbm Testing Strategy Configuration and Deliverablesmentioning
confidence: 99%
“…This activity was conceived to analyze the behavior of the facility and its main components. Some of these components are candidates as main or back-up solutions for the LLE loop of the HCLL TBS [1]. Moreover, the ability to run a large LLE loop, together with the lessons learned, will be useful for the design and operation of the final LLE loop of ITER.…”
Section: Introductionmentioning
confidence: 99%