2017
DOI: 10.1049/iet-gtd.2016.1808
|View full text |Cite
|
Sign up to set email alerts
|

Cross‐voltage short‐circuit calculation for mixed‐voltage quadruple‐circuit lines on the same tower

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2018
2018
2019
2019

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(4 citation statements)
references
References 9 publications
0
4
0
Order By: Relevance
“…Further, the PTPSC measured by 'PR3' can be obtained and then simplified into (7) based on (2), (3), (5)…”
Section: Phase Selection Results Of L3 In the Case Of An L2c-l3bc Faultmentioning
confidence: 99%
See 3 more Smart Citations
“…Further, the PTPSC measured by 'PR3' can be obtained and then simplified into (7) based on (2), (3), (5)…”
Section: Phase Selection Results Of L3 In the Case Of An L2c-l3bc Faultmentioning
confidence: 99%
“…Cross-voltage short-circuit faults can be classified into several types [5]: single-phase to single-phase cross-voltage faults, singlephase to two-phase cross-voltage faults, single-phase to three-phase cross-voltage faults, two-phase to two-phase cross-voltage faults etc.…”
Section: Analysis Of the Adaptability Of Phase Selectors Based On Ptpscmentioning
confidence: 99%
See 2 more Smart Citations