2012
DOI: 10.3997/2214-4609.20143343
|View full text |Cite
|
Sign up to set email alerts
|

Cross-hole Seismic Travel Time Tomography Applied before Tunnel Excavation by using TBM

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The difference between the observed arrival time from acquisition and the calculated arrival time will be used to invert the model by updating the velocity in iterative manner (Hole et.al, 1995). The inversion procedure is the regularisation scheme (Sule, 2012), which minimizes an objective function that includes norms that measure model roughness and data misfit. The objective function 𝜙𝜙 minimized at each iteration is…”
Section: Methodsmentioning
confidence: 99%
“…The difference between the observed arrival time from acquisition and the calculated arrival time will be used to invert the model by updating the velocity in iterative manner (Hole et.al, 1995). The inversion procedure is the regularisation scheme (Sule, 2012), which minimizes an objective function that includes norms that measure model roughness and data misfit. The objective function 𝜙𝜙 minimized at each iteration is…”
Section: Methodsmentioning
confidence: 99%