2022
DOI: 10.1016/j.procs.2021.12.154
|View full text |Cite
|
Sign up to set email alerts
|

Critical success factors for ICT project: A case study in project colocation government data center

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
1
0
1

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 11 publications
(9 citation statements)
references
References 9 publications
0
1
0
1
Order By: Relevance
“…1) Identifikasi indikator Indikator evaluasi pelayanan diperoleh dari dimensi yang telah ditetapkan. Dimensi-dimensi tersebut mencakup aspek-aspek kritis yang perlu dievaluasi dalam konteks sistem E-Government berdasarkan Kepmen nomor 595 Tahun 2020 tentang Pedoman Evaluasi Pelayanan Publik Berbasis Elektronik [16], [17]. Proses identifikasi indikator dilakukan dengan merinci setiap dimensi dan menentukan parameter yang dapat diukur untuk mencerminkan kinerja atau keberhasilan dalam setiap dimensi tersebut.…”
Section: Pengembangan Instrumenunclassified
“…1) Identifikasi indikator Indikator evaluasi pelayanan diperoleh dari dimensi yang telah ditetapkan. Dimensi-dimensi tersebut mencakup aspek-aspek kritis yang perlu dievaluasi dalam konteks sistem E-Government berdasarkan Kepmen nomor 595 Tahun 2020 tentang Pedoman Evaluasi Pelayanan Publik Berbasis Elektronik [16], [17]. Proses identifikasi indikator dilakukan dengan merinci setiap dimensi dan menentukan parameter yang dapat diukur untuk mencerminkan kinerja atau keberhasilan dalam setiap dimensi tersebut.…”
Section: Pengembangan Instrumenunclassified
“…By integrating both qualitative and quantitative criteria, the AHP method facilitates a comprehensive assessment of multiple factors while considering the decision maker's priorities (Özkan et al, 2022). This method incorporates a straightforward model specifically designed to tackle intricate problems and employs a scaling, ranking, or rating scheme to evaluate various intangible variables (Adywiratama et al, 2021). One notable aspect of the AHP method is the utilization of an intangible measure to define the research area and serve as a performance indicator for the project at hand.…”
Section: Figure 1 Sustainable Green Data Center Frameworkmentioning
confidence: 99%
“…If top management fails to delegate sufficient responsibility and power to the project manager or to support the project manager's recommendations, the overall project results will be negatively impacted (22). Research (12) analyzed the ICT project's critical success factors; ten CSFs were analyzed using AHP to establish their ranking. The value weight of Top Management Support is 33.1 percent.…”
Section: Informal | 106mentioning
confidence: 99%